Brick- 230 x 113 x 37. (As insulation) 230 x 113/108 x 37. Total thickness of the torpedo ladle brick wall comes out to be. At the barrel region = 13 + 37 + 113 +250 =413mm. At the charge pad
80 Ton machinery factory transport electric industrial agv robot. $3,000.00 – $4,000.00 / Set. 1.0 Sets (Min. Order) Efficiency electric remote control transfer agv car for racks movement. $3,000.00 – $4,000.00 /
In 2020, we ordered a 50-ton low-voltage rail-powered transfer cart from our company. The transfer cart is mainly used for the handling of steel coils. The following is the basic transfer cart parameter: Conveying material: steel coil Control mode: rgv fixed-point docking Transport load: 50t Positioning method: rfid+plc Positioning accuracy: ±5mm Running speed: 30m/min Power supply mode:
It is Europe’s leading producer of stainless quarto plates and also specializes in electrical and special steels, which it sells in the form of hot- and cold-rolled coils, heavy plates, and cold-formed profiles. The SIJ Acroni works is situated in Jesenice, about 60 kilometers northwest of the capital, Ljubljana.
The Slag Raking Machine is used to rake the slag layer from the surface of molten metal. It can be used on iron and steel ladles, aluminum holding furnaces and in other hot metal areas. This reduces the metallurgical load. It is a hydraulically operated machine of sturdy construction for use in steel plants.
Ladle for Ladle Refining Furnace: Steel ladles of sizes from 10 MT to 300 MT capacity are manufactured from IS: 2002 boiler quality plates as well as IS: 2062 plates. Design: The Hot metal ladle is of circular design with all welded construction.The material for the ladle shell and bottom shall be
For horizontal load transfers of a wide range of material, we have the heavy duty, high quality Transfer Cart solution you need. Transfer carts are used: to carry loads along assembly lines; transfer material from one work station to the next; store and transport an entire shift worth of production.
energy used in a plant can be required for metal melting and holding, this area of the die casting plant is being examined once again. A recent report sponsored by the U.S. Department of Energy* (DOE) showed that the seemingly simple pro-cess of melting
These 80-ton capacity riveted ladle hooks are for the 80 ton ladle beam above. Four 260-ton riveted laminated ladle hooks with bronze palm bushings, welded bumper stops and 1040 steel eye bushings. 35-ton ladle hook with steel palm bushings and wear strips for hook protection.
Scrap Transfer car on weighing system: We are engaged in manufacturing a range of high quality and precisely engineered Ladle Weighing Car and Scrap Weighing Car. Our products are manufactured on the basis of strain gauge load cell. Our product range
The load capacity can be from 1t to 300t, also can customized according to your require. For the special structure of easy operating, it can be used in variety occasions. It can improve the working frequency in the warehouse, load or unload occasion. It is
used to provide material continuously to a process. As one hopper is emptying, the other can be filling If the system is sized correctly, there is no interruption to the material flow on the discharge belt. Advantages of this system are: • Continuous material flow.
The two identical cranes, which have load capacities of up to 120 tonnes, will be used for handling casting ladles and for feeding the casting furnaces with molten metal. The many years of experience gained by Terex Material Handling in the development and manufacture of Demag brand cranes for the foundry sector were also a decisive factor for
CAPACITY: 0 – 1000 TONS. Morello powered rail cart represents an economical solution compared to self-propelled transporters without giving up safety and reliability. Transfer with rail trolley by Morello is perfectly adapted to any type of load including largest and heaviest up to 1,000 tons on fixed and constrained routes.
With new development in energy efficient coils, new refractory material, reduction of converter and transformer losses, and the state of art furnace equipment, the energy losses are reduced to a level of 60 kWh/t to 90 kWh/t. The new furnaces have efficiency in the range of 81 % to 87 %.