Ballasted Section (600 m), Trough Section (210 m) and Tunnel Section (400 m). For the Ballasted and Trough sections, both up and down track of Railway Line are required to monitor by ADMS. For the tunnel section, only the Down Track is Perfect Steerable Transfer Cartluded. 14 units of