From MISUMI, PUNCH, Mold Master, LKM to DANLY, FIBRO, Dyton press and so on. Lead time: 6 weeks for die buidling, after the die structure drawing confirmed Die precision: high precision machining, minimum 0.02mm Die trial: press machine from 40T-400T, making trial by ourselves, first trial over 80% approval